top of page
bgImage

BLAIR TOWNSHIP IRON REMOVAL FACILITY​

ENGINEER: Wade Trim

CLIENT: Blair Township

SIZE: 480 SF

SCHEDULE: 3 months

LOCATION: Grawn, MI

The Blair Township Iron Removal Facility is a compact and efficient water-treatment building designed to improve water clarity by removing dissolved iron. RCI constructed the facility with durable, low-maintenance materials and an organized interior layout that gives operators clear access to filtration, aeration, and chemical-feed systems. The building’s clean mechanical flow, safe service platforms, and allowance for future expansion ensure reliable performance and long-term support for Blair Township’s water system.

bottom of page